吐哈油田自发绿电消纳同比增长8.87%
欢迎阅读与学习      

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 13002979178 OR 邮箱Email: Lngbbs@qq.com

摘要:吐哈油田自发绿电消纳同比增长8.87%

关键词:吐哈油田 绿电
分享到:


中国石油网消息:8月12日获悉,今年前7个月,油田自发绿电消纳总量达1.05亿千瓦时,同比增长8.87%。

China Oil News: On August 12th, it was learned that in the first seven months of this year, the total amount of green electricity consumed by the oilfield on its own reached 105 million kilowatt-hours, an increase of 8.87% year-on-year.


“十四五”以来,吐哈油田立足区域风光资源优势,加快布局标杆性新能源项目,持续补齐传统生产能耗短板。吐鲁番120兆瓦源网荷储一体化项目是新疆首个建成投运的“源网荷储”一体化项目,于2022年12月31日正式并网发电。准东4500千瓦分布式光伏项目自2025年12月10日并网投运以来,在有效运行期内日均发电量约3万千瓦时。

Since the "14th Five-Year Plan" period, Tuha Oilfield has leveraged its regional wind and solar energy advantages to accelerate the layout of benchmark new energy projects and continuously make up for the shortcomings in traditional production energy consumption. The Turpan 120-megawatt source-grid-load-storage integrated project is the first "source-grid-load-storage" integrated project in Xinjiang to be completed and put into operation. It officially went online and started generating electricity on December 31, 2022. The Jindu 4,500-kilowatt distributed photovoltaic project has been in operation since December 10, 2025, with an average daily power generation of approximately 30,000 kilowatt-hours during the effective operation period.


针对绿电“发得多、用不好”的行业共性问题,吐哈油田主动转变发展思路,推动新能源建设从“重规模、重投产”向“重消纳、重实效”转型,通过机制创新与技术升级双向发力,全方位激活绿电利用潜能。

In response to the common problem in the green power industry - generating a large amount but not utilizing it effectively, Tuha Oilfield has actively changed its development strategy, promoting the transformation of new energy construction from "emphasizing scale and production" to "emphasizing consumption and effectiveness". Through the dual efforts of mechanism innovation and technological upgrading, it fully activates the potential for the utilization of green power.


在机制层面,油田实施分时电价调控策略,科学统筹全域用电负荷,精准优化电力资源时空配置;同步推进生产设备电气化改造,持续拓展绿电应用场景,构建起多层次绿电消纳体系。在技术层面,依托智能化、精细化电力动态调度模式,吐哈油田新能源事业部全力推动吐鲁番区域日间生产负荷由绿电兜底保障,实现白天外网零购电,大幅降低外购电成本,实现清洁电力闭环高效利用。

At the mechanism level, the oilfield implements a time-based electricity price regulation strategy, scientifically coordinating the overall electricity load across the region, and precisely optimizing the spatial and temporal allocation of power resources. Simultaneously, it promotes the electrification transformation of production equipment, continuously expands the application scenarios of green electricity, and builds a multi-level green electricity consumption system. At the technical level, relying on an intelligent and refined dynamic power dispatching model, the New Energy Division of Tuha Oilfield fully promotes the use of green electricity to guarantee the daytime production load in the Turpan area, achieving zero purchase of electricity from the external grid during the day, significantly reducing the cost of purchased electricity, and achieving efficient and closed-loop utilization of clean electricity.


各生产管理区因地制宜探索差异化消纳路径,转型成效多点迸发:鄯善采油管理区以电驱压缩机替代传统气驱设备,仅温米、丘陵两座联合站每年即可节约综合成本246万元。鲁克沁采油管理区创新实施“热电联产+电加热炉”协同运行模式,日均消纳绿电4万千瓦时;生活点电锅炉及储热项目、闲置水罐改造储能项目投运后,每年新增绿电消纳超百万千瓦时。吐鲁番采油管理区系统解决变压器空载、系统能耗偏高等问题,绿电消纳超1000万千瓦时。准东采油管理区4500千瓦分布式光伏项目所发绿电,全部由萨探主力产油区块设备消纳。

Each production management area has explored differentiated consumption paths based on local conditions, and the transformation effects have been emerging in multiple areas: The Shanshan Oil Production Management Area replaced traditional gas-driven equipment with electric-driven compressors, and the two joint stations of Wenmi and Chuilou could save a total of 2.46 million yuan in annual costs. The Luokechen Oil Production Management Area innovatively implemented a "thermal power generation + electric heating furnace" collaborative operation mode, consuming an average of 40,000 kilowatt-hours of green electricity per day. After the operation of the domestic-use electric boilers and heat storage projects, as well as the renovation of idle water tanks for energy storage projects, the annual green electricity consumption increased by over 10 million kilowatt-hours. The Turpan Oil Production Management Area solved problems such as transformer no-load operation and excessive system energy consumption, and consumed over 10 million kilowatt-hours of green electricity. The 4,500-kilowatt distributed photovoltaic project of the Jindu Oil Production Management Area generated green electricity, which was all consumed by the main oil production blocks of the Sha exploration area.


目前,吐哈油田所有油区均已实现绿电覆盖。

At present, all oil areas in the Tuha Oilfield have achieved green power coverage.


【大 中 小】【打印】 【繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部】