摘要: LNG项目传统的建设模式是在项目所在地完成所有施工建设任务,这种方式建设时间长,人力、物力资源投入集中,存在大量的交叉作业,还需要建设大量的施工临时设施,对厂址周边环境影响较大。The traditional construction model for LNG projects is to complete all ..
|
LNG项目传统的建设模式是在项目所在地完成所有施工建设任务,这种方式建设时间长,人力、物力资源投入集中,存在大量的交叉作业,还需要建设大量的施工临时设施,对厂址周边环境影响较大。 The traditional construction model for LNG projects is to complete all construction tasks at the project site. This method involves a long construction period, concentrated investment of human and material resources, numerous cross-work operations, and the need to build a large number of temporary construction facilities, which has a significant impact on the surrounding environment of the site. LNG模块化装置,将功能组件集成于一个整体,可以整体安装、移动。将整个装置在加工厂内整体深度预组装、配管和布线,可以完全实现其功能;运输时可拆分成数个模块方便运输,到现场后直接拼装后使用。 The LNG modular device integrates functional components into a single unit, allowing for overall installation and movement. The entire device is pre-assembled, piped, and wired in its entirety within the processing plant, enabling complete realization of its functions. During transportation, it can be disassembled into several modules for easier transportation, and upon arrival at the site, it can be directly assembled and put into use. 相比橇装装置,模块化装置具有以下优势:
Compared with skid-mounted devices, modular devices have the following advantages:
|